Friday, 28 March 2008
Friday, 21 March 2008
Pavilion latest
The Foundations are laid in the courtyard. S & G construction have done a great job so far. A number of unmarked drainage pipes were uncovered during the dig, none were damaged, but it did mean that it took longer.
The Red Dishes are spun and the rest of the steelwork is being prepared by Aspect Metalcraft in Eastbourne.
The plan is to install the steelwork and the circular gabion seat in the week starting the 14th of April.
I am hoping to find a couple of volunteers to help me shape and fill the gabions with stones.
These pictures show lines on the gabions wall where the 32 individual gabion cages meet.
Subscribe to:
Posts (Atom)