Friday, 25 January 2008

Rainwater


Today I am working out how to drain the rainwater collected in the rims of the dishes, the idea is for the water to run down from the higher dishes to the lower dishes then to fall onto the gabion, irrigating the plants growing in the gabion.

Wednesday, 23 January 2008

Project progress

I have been busy with Our Space, last week I had a group of Willingdon students at my studio for a tour with questions and discussion about my projects and theirs, which all sounded very advanced and interesting, to be working at that level at that age is very impressive.
I have also been meeting contractors to discuss the tenders submitted, all looks very positive and on track for our March launch.

Tuesday, 8 January 2008

Happy New Year

Wednesday, 12 December 2007

Pavilion latest



Structural drawings of the pavilion are completed and sent off to selected contractors, this drawing shows the Dish positioning and fixing details.

Friday, 9 November 2007

Structural considerations




I am currently working with Tom Bedford on the structural issues of the pavilion, specifically how we hold up the dishes over the entrance. I have also been rearranging the supporting posts, with a view to spreading the dishes out a bit, creating a more dynamic spread. These are the latest pictures.

Friday, 19 October 2007

Red Balloons



To give the visitors to the exhibition an idea of the actual scale of the stucture, I drew the footprint of the Gabion wall on the paving of the courtyard. Tom Bedford (our stuctural engineer) suggested that we use balloons to indicate the height of the pavilion, so we did.

Our Space Preview






Yesterday we spent the day setting up the exhibition, lots of very busy people, special thanks to George, Decklan, Matt, Kim, Michael, Dan, Gemma, Holly and Ben along with all the Our Space team and everyone else for all the hard work, the show looks great. Here are some pictures of the preview. The show is on until Saturday 20th Oct.